Remodeling is a delicate process. Especially if you plan to stay in the home during the process. You need specifications and a room schedule before you start . A copy of the beginning of our full version is attached. Don’t worry it is always 10 to 20% of the list once we customize it for your project.. It is included so that you can get a feel for all the issues that should be discussed before the project starts. The electricity, the hours, the toilet , parking, storage of materials. Details that make a project flow.

To contact us:

Text Box: Gene
     McCormick
                    Construction
Text Box:

 

 

01500 – Temporary Facilities and Controls - This work shall consist of the application of temporary measures throughout the life of the project. 

01510 – Temporary Utilities - All connections and extensions required to provide temporary utilities shall be made by the Contractor at the Contractor’s expense.

01511 – Temporary ElectricityContractor to provide and install temporary power for construction site.  Connect to existing power service without disrupting local service requirements. Power feeder service characteristics shall be compatible with the service from which it is taken.  Size, type and loading shall be per requirements as established by the National Electric Code (NEC).  The contractor shall provide main service disconnect and over-current protection at a convenient location in accordance with the NEC.  The Contractor shall provide power outlets for construction operations, with branch wiring and distribution boxes located as necessary and shall provide flexible power cords as required.  Provide and install distribution equipment, wiring and outlets to provide single phase branch circuits for power and lighting.

01514 – Temporary Heating, Cooling and Ventilation - Contractor to provide and install temporary heating, cooling and ventilation for construction site.  Contractor to maintain system during construction, while exercising measures to conserve energy.   Ventilate enclosed areas to assist cure of materials, to dissipate humidity and to prevent accumulation of dust, fumes, vapors or gases.  Supplement with temporary fan units as required to maintain clean air for construction operations.

01515 – Temporary LightingContractor to provide and install temporary lighting for construction site.  Provide and install temporary lighting in all work areas sufficient to maintain a lighting level during working hours not less than the lighting level required by OSHA standards.  As permanent lighting facilities are completed, they many be used in lieu of temporary facilities. Provide temporary lighting as required to satisfy safety and security requirements.  Maintain a minimum illumination level of 30 foot-candles measured 3 ft. above floor in areas where finish trades are performing work.  At exterior areas, provide 1 foot-candle of light after dark for security purposes.

01517 – Temporary TelephoneContractor to provide and install temporary telephone for construction site.

01518 – Temporary WaterContractor to provide and install temporary water for construction site.  Connect to an existing water source for construction operations.

01520 – Construction FacilitiesField offices and sheds shall be portable or mobile buildings, or buildings constructed with floors raised above the ground, securely fixed to foundations, with steps and landings at entrance doors.  Structurally sound, secure, weather tight enclosures for office and storage spaces shall be maintained during progress of work and removed at completion of work.  Size of field offices and sheds shall depend on contractors needs.  Install appropriate fire extinguisher.  HVAC shall be adequate to maintain comfortable conditions.  At completion of work, all temporary facilities shall be removed and area restored to new condition.

01523 – Sanitary FacilitiesExisting facilities shall not be used. Contractor shall provide and maintain in a neat and sanitary condition such accommodations for the use of his employees as will comply with laws and regulations. Temporary toilet facilities may consist of portable toilets.  The number shall be based on number of workers, 1 toilet per 15 workers.  Toilet facilities shall be kept supplied and clean and in sanitary condition until the completion of the work and then shall be removed from the site.  Upon removal the site shall be properly cleaned and graded.

01530 – Temporary Construction - The contractor shall provide and maintain for duration of work all required temporary stairs, ladders, ramps, runways and hoists for use of all trades.

01540 – Construction AidsThe contractor to provide all construction aids needed during construction which shall include but not limited to; elevators, hoists, cranes, etc.

01542 – Construction Scaffolding and Platforms – The contractor shall provide and maintain for duration of work all required temporary standing scaffolding. 'Independent tied' scaffolds will normally be provided for painting, pointing or other maintenance work. 'Putlog scaffolds', used for the construction of brick walls, have only one row of standards which are usually erected some 900mm from the face of the wall, with the boards carried on horizontal members known as 'putlogs'. When used in new construction, the flattened ends of the putlogs are built into the bed joints as work proceeds and then withdrawn on completion, the not

01570 – Temporary Controls - This work shall consist of the application of temporary measures throughout the life of the project to control erosion and siltation.  Such measures shall include, but are not limited to, the use of berms, dikes, dams, sediment basins, fiber mats, silt fences, straw bales, washed gravel or crushed stone, mulch, grasses, slope drains, temporary seeding and other methods.  Temporary erosion and siltation control measures as described herein, shall be applied to erodible material exposed by any activity associated with the construction and consistent with state and local control standards.

01600 – Product Requirements (Scope of Work) - All materials shall be installed in strict accordance with the manufacturer’s written specifications or Material’s Institute Standards. Where the manufacturer’s recommended details are used, the manufacturer shall be responsible for the performance of their product. All Items not specifically mentioned that are required to make the work complete and operational shall be included. 

Installation and Storage - All materials, supplies and equipment shall be installed per manufacturer’s recommendations and per applicable codes and requirements.  Material stored on site shall be protected from damage by moisture, wind, sun, abuse or any other harmful effects.

 

Phone:  (858) 722-9108               (619) 581-5950

Fax:                           (858) 345-3847

E-mail:   info@genemccormickconstruction.com

12455 Via Cabezon

San Diego, CA 92129

Ca lic # 878838